Opens in a new tab

Construction of a temporary sidewalk between SW 30th Avenue and SW 28th Avenue began on Nov. 9, 2026.

This initial work prepares the site for future ground-mounted noise barrier wall construction.

Learn About:

NW/NE 48th Street Bridge Biweekly Update Week of Oct. 12-Oct. 26, 2026

Back to all Construction Updates

NW/NE 48th Street Bridge Biweekly Update Week of Oct. 12-Oct. 26, 2026

Early Construction Work
NW 48th Street Bridge

Southbound S.R. 9/I-95 Full Closure Notice: Southbound S.R. 9/I-95 between just south of SW 10th Street and S.R. 834/Sample Road will be closed to traffic from 8 p.m. until 6 a.m. on Tuesday, Oct. 13 for equipment mobilization. Wednesday, Oct. 14 and Thursday, Oct. 15 will be reserved as contingency nights should weather or unforseen circumstances arise.

One lane will close at 8 p.m., and all lanes will be closed by 9 p.m., reopening by 6 a.m. Southbound motorists will be detoured via the SW 10th Street exit ramp, southbound Military Trail, and eastbound S.R. 834/Sample Road to re-enter southbound S.R. 9/I-95. The southbound S.R. 9/I-95 Express Lanes between S.R. 810/Hillsboro Boulevard and S.R. 814/Atlantic Boulevard will also be closed. Motorists may re-enter the Express Lanes by the S.R. 814/Atlantic Boulevard entrance.

In association with this full closure, the following entrance ramps to southbound S.R. 9/I-95 will also be closed:

  • Southbound S.R. 9/I-95 entrance ramp from eastbound and westbound S.R. 810/Hillsboro Boulevard.
  • Southbound S.R. 9/I-95 entrance ramp from eastbound and westbound SW 10th Street.

Motorists seeking to access southbound S.R. 9/I-95 from these locations will be detoured via southbound S.R. 811/N. Dixie Highway and westbound S.R. 834/Sample Road. To ensure the safety of the traveling public, Florida Highway Patrol (FHP) officers will be on site, and posted detour signage will be in place to guide motorists safely through the designated detour routes. Please click here to view the detour flyer.

COVERS OCT. 12 – OCT. 26

  • Crews have completed pile driving operations on the west side of S.R.9/I-95, successfully installing all 10 out of the 10 planned piles in this area. Crews will now begin pile driving operations withing the median and along the east side of the roadway. A total of 38 piles will be installed as part of this work.
  • Demolition activities will continue on the easternmost bridge.
  • Within the S.R.9/I-95 median, crews are digging around existing piles that conflict with the future bridge foundations in preparation for their removal. Once this work is complete, crews will install a critical temporary support wall to facilitate ongoing construction. These activities are anticipated to take approximately two weeks. Following the installation of the critical temporary wall, crews will remove existing conflicting piles.
  • On NW/NE 48th Street, west of S.R. 9/I-95, crews are placing and compacting material to prepare the ground for the new roadway and bridge. Crews are also forming the new support wall in this area.
  • On the east side of S.R. 9/I-95, excavation is underway to complete the removal of the existing bridge substructure and preparing the area for construction of the new support wall.
  • Temporary traffic control devices and lane closures will remain in place along S.R. 9/I-95 as needed to safely accommodate construction activities while maintaining traffic flow.
  • Crews will continue to monitor and maintain traffic control devices throughout the work zone to help safely guide motorists, pedestrians, and bicyclists.
  • The northbound S.R. 9/I-95 Express Lanes between S.R. 816/Oakland Park Boulevard and S.R. 834/Sample Road will be closed to traffic nightly from 9 p.m. until 5:30 a.m., Sunday through Thursday, for bridge demolition and construction operations. Motorists will be directed to exit the Express Lanes onto the general-purpose lanes at S.R. 816/Oakland Park Boulevard and may re-enter the Express Lanes north of S.R. 810/Hillsboro Boulevard.
  • The southbound S.R. 9/I-95 Express Lanes between S.R. 810/Hillsboro Boulevard and S.R. 814/Atlantic Boulevard will be closed to traffic nightly from 9 p.m. until 5:30 a.m., Sunday through Thursday, for overhead bridge demolition and bridge construction operations. Motorists will be directed to exit the Express Lanes onto the general-purpose lanes at S.R. 810/Hillsboro Boulevard and may re-enter the Express Lanes south of S.R. 816/Oakland Park Boulevard.

Motorists should allow additional travel time, follow posted detour signage, and use caution when traveling through the work zone.

  • Northbound S.R. 9/I-95 will have the two outside general-purpose lanes closed, between north of S.R. 834/Sample Road and SW 10th Street, from 9 p.m. until 5:30 a.m., Sunday through Thursday, as needed, for bridge column demolition and bridge construction operations.
  • Southbound S.R. 9/I-95 will have the two outside general-purpose lanes closed, between north of SW 10th Street and S.R. 834/Sample Road, from 9 p.m. until 5:30 a.m., Sunday through Thursday, as needed, for bridge column demolition and bridge construction operations.

For a comprehensive view of all lane closures, please click here.

Please click the button below if you wish to only receive updates on the NW/NE 48th Street Bridge.